Welcome to LCMNA!

LCMNA - 6/13-6/24 Oracle Rd: CalleConcordia/Tangerine
AGE Brand
Click banner to support our sponsor



      EVENTS
10/21   Transportation Mtg (NWATC)

     Login
Nickname

Password

Don't have an account yet? You can create one. As a registered user you have some advantages like theme manager, comments configuration and post comments with your name.

     Areas
 Home
 Communication
 Your Account
 Feedback
 Web Links
 Sponsors
 About LCMNA
 FAQ's

· Advertising
· Content
· NuCalendar

     Calendar
<
September 2010
>
SMTWTFS

1234
567891011
12131415161718
19202122232425
2627282930

 6/13-6/24 Oracle Rd: CalleConcordia/Tangerine

Hot Topics
ARIZONA DEPARTMENT OF TRANSPORTATION

Oracle Road: Tangerine Road to Calle Concordia Traffic Update

Nighttime Milling and Paving Operations June 13-24, 2010



Milling Operations

North- and southbound Oracle Road from Tangerine Road to Calle Concordia requires resurfacing before rubberized asphalt paving can occur. Milling of the existing surface of the roadway and intersections is necessary to ensure the roadway is in condition for final paving.

General Restrictions During Nighttime Milling and Paving June 13 – 24 include:

  • A speed limit reduction to 35 mph through the construction zone.


  • Left, right and U-turns may be restricted; law enforcement will be on-site to assist traffic through the paving operations.


  • Intermittent closures during nighttime work at the intersections of Calle Concordia, Linda Vista, El Conquistador Way, Pusch View Lane, First Avenue, Steam Pump Way, La Reserve, Hanley Boulevard, Rams Pass, Innovation Marketplace and Tangerine Road.


  • Please obey all signs.


Motorists may want to:


  • Consider alternative routes during the milling and paving operations.

  • Expect delays; adjust your drive time accordingly for possible restrictions in the construction zone.


Specific Restrictions as Scheduled Each Night: 

June 13 – 14

Sunday, June 13, and Monday, June 14, from 6 p.m. to 7 a.m. the following morning, north- and southbound Oracle Road is scheduled for milling of the right (outside) lanes from Tangerine Road to Calle Concordia.


June 15 – 16

Tuesday, June 15, and Wednesday, June 16, from 6 p.m. to 7 a.m. the following morning, north- and southbound Oracle Road is scheduled for milling of the left (inside) and middle lanes from Tangerine Road to Steam Pump Way.


Paving is scheduled for the right (outside) lanes for northbound Calle Concordia to La Reserve Drive, and southbound Pusch View Lane to Calle Concordia.


June 17

Thursday, June 17, from 6 p.m. to 7 a.m. the following morning, southbound Oracle Road is scheduled for milling of the left (inside) lane from La Reserve Drive to Calle Concordia.

Paving is scheduled for the right (outside) lanes of northbound Oracle Road from La Reserve Drive to Tangerine Road, and southbound Oracle Road from Tangerine Road to Rams Field Pass.


June 20 – 21

Sunday, June 20, and Monday, June 21, from 6 p.m. to 7 a.m. the following morning, north- and southbound Oracle Road is scheduled for milling of the middle lanes from Calle Concordia to Pusch View Lane.

Paving is scheduled for north- and southbound Oracle Road from Tangerine Road to Pusch View Lane.


June 22 – 24

Tuesday, June 22 through Thursday, June 24, from 6 p.m. to 7 a.m. the following morning, north- and southbound Oracle Road is scheduled for paving of the left (inside) and middle lanes from Calle Concordia to Pusch View Lane.

Please note: Changes to construction plans can happen frequently due to weather, equipment availability and personnel issues. We try to anticipate construction activities a week in advance but changes may occur. Intermittent lane closures, with short delays, may not always be known in advance.


Please note that by State and County statutes, bicycles may use the travel lanes in a roadway, and bicyclists have the same rights and responsibilities as drivers of motor vehicles. At various times throughout the construction, for the safety of the public and construction personnel, the shoulder of the roadway will be closed. To avoid these road restrictions, bicyclists may wish to access alternative routes to Oracle Road.


For more information contact:  Susan Parcells, Gordley Design Group

Public Involvement Specialist

Phone: (520) 327-6077

E-mail: sue@gordleydesign.com

Visit our website: www.oracleroad.info

077PMH545901C061310

###




 
     Related Links
· More about Hot Topics
· News by donnajean


Most read story about Hot Topics:
spam in forums


     Article Rating
Average Score: 0
Votes: 0

Please take a second and vote for this article:

Excellent
Very Good
Good
Regular
Bad


     Options

 Printer Friendly Printer Friendly


Associated Topics

Northwest Area Transportation Coalition





PHP-Nuke Copyright © 2005 by Francisco Burzi. This is free software, and you may redistribute it under the GPL. PHP-Nuke comes with absolutely no warranty, for details, see the license.
Page Generation: 0.63 Seconds